[1]
Limantoro, C. et al. 2023. ANALISA FAKTOR COST OVERRUNS DENGAN METODE INTERPRETIVE STRUCTURAL MODELLING PADA BEBERAPA PROYEK KONSTRUKSI DI INDONESIA. Dimensi Utama Teknik Sipil. 10, 1 (Apr. 2023), 20–37. DOI:https://doi.org/10.9744/duts.10.1.20-37.