[1]
Gunawan, L.S.M. et al. 2019. OPTIMIZED MANAGEMENT STRATEGY FOR CONSTRUCTION PROJECTS CONSIDERING THE TRADE-OFF OF ESTIMATE SCHEDULE AND COST AT COMPLETION. Dimensi Utama Teknik Sipil. 6, 2 (Oct. 2019), 26–37. DOI:https://doi.org/10.9744/duts.6.2.26-37.