[1]
Wiyono, E.S., Dusia, E.L., Alifen, R.S. and Rahardjo, J. 2014. PENGARUH PARAMETER BANGUNAN HIJAU GBCI TERHADAP FASE PROYEK. Dimensi Utama Teknik Sipil. 1, 1 (Oct. 2014), 8–13. DOI:https://doi.org/10.9744/duts.1.1.8-13.