[1]
Rumpuin, A.F., Wahjudi, D. and Prayogo, D. 2020. PENGEMBANGAN MODEL MITIGASI RISIKO KETERLAMBATAN PROYEK BERBASIS FAILURE MODE AND EFFECT ANALYSIS: STUDI KASUS DI PT X. Dimensi Utama Teknik Sipil. 7, 1 (Apr. 2020), 47–58. DOI:https://doi.org/10.9744/duts.7.1.47-58.