[1]
Sikomena, E.F., Widyadana, I.G.A. and Prayogo, D. 2021. OPTIMASI RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM MENGGUNAKAN METODE GENETIC ALGORITHM DAN SYMBIOTIC ORGANISMS SEARCH. Dimensi Utama Teknik Sipil. 8, 1 (Apr. 2021), 49–59. DOI:https://doi.org/10.9744/duts.8.1.49-59.