[1]
Kurnia, J. and Widyadana, I.G.A. 2022. IDENTIFIKASI DAN ELIMINASI PEMBOROSAN DENGAN MENGGUNAKAN KOMBINASI METODE VALUE STREAM MAPPING (VSM) DAN COST TIME PROFILE (CTP): STUDI KASUS DI PT SABE INDONESIA. Dimensi Utama Teknik Sipil. 9, 2 (Oct. 2022), 168–183. DOI:https://doi.org/10.9744/duts.9.2.168-183.