Gunawan, L. S. M., Cheng, M.-Y., & Prayogo, D. (2019). OPTIMIZED MANAGEMENT STRATEGY FOR CONSTRUCTION PROJECTS CONSIDERING THE TRADE-OFF OF ESTIMATE SCHEDULE AND COST AT COMPLETION. Dimensi Utama Teknik Sipil, 6(2), 26–37. https://doi.org/10.9744/duts.6.2.26-37