Sikomena, E. F., Widyadana, I. G. A., & Prayogo, D. (2021). OPTIMASI RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM MENGGUNAKAN METODE GENETIC ALGORITHM DAN SYMBIOTIC ORGANISMS SEARCH. Dimensi Utama Teknik Sipil, 8(1), 49–59. https://doi.org/10.9744/duts.8.1.49-59