Hodianto, V. A., & I-Tung, Y. (2022). MULTI-MODE RESOURCE CONSTRAINED MULTI PROJECT SCHEDULING PROBLEM OPTIMIZATION WITH SYMBIOTIC ORGANISMS SEARCH. Dimensi Utama Teknik Sipil, 9(1), 77–96. https://doi.org/10.9744/duts.9.1.77-96