ALVIN, N.; YANG, I.-T. MULTI-RESOURCE ALLOCATION AND LEVELING IN MULTI-PROJECT SCHEDULING PROBLEM WITH HYBRID-CHROMOSOME NON-DOMINATED SORTING GENETIC ALGORITHM II. Dimensi Utama Teknik Sipil, [S. l.], v. 10, n. 2, p. 232–251, 2023. DOI: 10.9744/duts.10.2.232-251. Disponível em: https://duts.petra.ac.id/index.php/duts/article/view/287. Acesso em: 12 may. 2024.