Gunawan, Liem Stefani Meilia, Min-Yuan Cheng, and Doddy Prayogo. 2019. “OPTIMIZED MANAGEMENT STRATEGY FOR CONSTRUCTION PROJECTS CONSIDERING THE TRADE-OFF OF ESTIMATE SCHEDULE AND COST AT COMPLETION”. Dimensi Utama Teknik Sipil 6 (2):26-37. https://doi.org/10.9744/duts.6.2.26-37.