Jefferson, W. and Andi, A. (2023) “ANALISIS PRODUKTIVITAS PEKERJAAN PASANGAN BATA RINGAN MENGGUNAKAN METHOD PRODUCTIVITY DELAY MODEL (MPDM) PADA PROYEK APARTEMEN DI SURABAYA”, Dimensi Utama Teknik Sipil, 10(1), pp. 120–136. doi: 10.9744/duts.10.1.120-136.