Setiadi, I. P. and Andi, A. (2018) “MONITORING DAN ANALISIS JADWAL PROYEK MENGGUNAKAN METODE PERFORMANCE INTENSITY DAN CPM PADA PROYEK HOTEL”, Dimensi Utama Teknik Sipil, 5(2), pp. 17–25. doi: 10.9744/duts.5.2.17-25.