Gunawan, L. S. M., Cheng, M.-Y. and Prayogo, D. (2019) “OPTIMIZED MANAGEMENT STRATEGY FOR CONSTRUCTION PROJECTS CONSIDERING THE TRADE-OFF OF ESTIMATE SCHEDULE AND COST AT COMPLETION”, Dimensi Utama Teknik Sipil, 6(2), pp. 26–37. doi: 10.9744/duts.6.2.26-37.