Sikomena, E. F., Widyadana, I. G. A. and Prayogo, D. (2021) “OPTIMASI RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM MENGGUNAKAN METODE GENETIC ALGORITHM DAN SYMBIOTIC ORGANISMS SEARCH”, Dimensi Utama Teknik Sipil, 8(1), pp. 49–59. doi: 10.9744/duts.8.1.49-59.