[1]
C. Limantoro, A. Andi, and J. Rahardjo, “ANALISA FAKTOR COST OVERRUNS DENGAN METODE INTERPRETIVE STRUCTURAL MODELLING PADA BEBERAPA PROYEK KONSTRUKSI DI INDONESIA”, duts, vol. 10, no. 1, pp. 20–37, Apr. 2023.