Sikomena, E. F., I. G. A. Widyadana, and D. Prayogo. “OPTIMASI RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM MENGGUNAKAN METODE GENETIC ALGORITHM DAN SYMBIOTIC ORGANISMS SEARCH”. Dimensi Utama Teknik Sipil, vol. 8, no. 1, Apr. 2021, pp. 49-59, doi:10.9744/duts.8.1.49-59.